Terms and Conditions
For new construction: Customer is responsible for supplying electrical power to job site.
Garage is to be cleared of all materials and debris to make adequate work area for installation of door.
A Dry-Run charge will apply if installers come to the job on the day scheduled and door(s) is unable to be installed because of failure to meet the requirements outlined below. Installers may elect to complete work necessary to facilitate installation and customer will be charged accordingly.
If Blue Ridge Doors, Inc. is not notified within 7 days of job completion, job is considered to be accepted by customer as is.
A re-stock charge will apply for change or cancellation of special size/style door and accessory orders.
Framing Detail
Door Installation Check List. You will need
- 2″ x 6″ Back jamb inside of door opening, as per framing detail shown
- 2″ x 6″ mounting pad for spring, positioned in center above door opening, extending vertically above opening 14″ – 16″, as headroom permits
- Finished concrete slab floor
- Sheet-rock to be hung (if applicable)
- Garage is to be clear of materials and debris to insure adequate work area to install door
- Electric power to be supplied by customer unless other arrangements have been made
Headroom Requirements
- Single Car-12″ above door height
- Double Car-12″ above door height
- If headroom is less than 12″, Please advise.
Opening Requirements
Width and Height – Finished Opening is to be the exact size of the door measured from the finished jamb to finished jamb and finished header to finished floor.